Supervision and coordination for the execution of a GPON network project in the cities of Salinas and Portoviejo with a total of 20,000 users for the company SETEL.
Coordination, planning, installation, and testing of a fiber optic network for service enablement between the Paluguillo Station and the Puembo Substation. 16 km of fiber optic deployment through ducts, 60 network splices, testing, and system commissioning.
Deployment of ADSS fiber optic cable on poles to support water meter control services in the offices of Papallacta and La Mica. 8 km of fiber optic deployment, 144 fiber splices, equipment installation, testing, and system commissioning.
Technical management in the construction of fiber optic networks for the project “FIBER OPTIC NETWORK PROJECT PALUGUILLO - RURAL LOCATIONS” for Quito Potable Water Company. The project includes the installation of 85 km of fiber optic cable through ducts, 5 km of aerial fiber, and an estimated 1,000 network splices. As part of the project, georeferenced plans in Google with network construction details have been delivered.
Coordination and construction of a 20 km aerial fiber optic link between the cities of Calceta and Tosagua. Verification of technical details, delivery of the system plan in AutoCAD and GIS, and certification testing of the link.
Data collection for the evaluation of details prior to the implementation of an FTTH system using georeferenced plans and associated databases. The project's objective is to establish a reference for the potential number of network users and the technical details of the existing infrastructure. The project is being developed in several cities in Ecuador, with a scope of 30,000 HP.
Technical support for Unitec Marine to determing electrical faults in various cabins of the Mardi Grass cruise ship. Electrical network testing with Megger equipment and fault identification in the network.
Technical support for the deployment of a structured cabling network for the Carnival cruise ship. Installation of 300 network points and connections to terminal equipment.